Dulles International Airport Terminal Expansion

Mr.Hamid M Tehrani, P.E. currently the Director of Engineering at Raheja Construction, provided oversight and project management to complete the East Basement Expansion – Package 8 project of the Dulles International Airport.

The project required retaining walls for the ramp to the lower level of the East Back Bay Expansion for tug truck traffic flow. In addition, the project required rerouting of the existing storm drainage pipes, electrical, telecommunication duct banks and reconfiguration of the service road to allow access to the upper level of the east baggage expansion.

Co-ordination of the construction documents with the design team and processing plans through MWAA for approval and construction administration were part of the services provided under this project. The project was integrally involved in evaluating the available options, the cost effectiveness of the options, the impacts on the adjacent Main Terminal functions, the potential impacts on the future people mover station, safety egress considerations, and repavement.
© Copyright 2025 Raheja Construction, All Rights Reserved.