Mr.Hamid M Tehrani, P.E. currently the Director of Engineering at Raheja Construction, provided oversight and project management to complete the East Basement Expansion – Package 8 project of the Dulles International Airport.
The project required retaining walls for the ramp to the lower level of the East Back Bay Expansion for tug truck traffic flow. In addition, the project required rerouting of the existing storm drainage pipes, electrical, telecommunication duct banks and reconfiguration of the service road to allow access to the upper level of the east baggage expansion.