The objective of the project was to remove the existing walkways and design new elliptical walkways including installation of a 30” high security walls around the Washington Monument, re-grading of the open spaces on the Washington monument site, and designing a new drainage and irrigation system.

The site plans were prepared and submitted to the District of Columbia reviewing authorities for site plan approval and to secure construction permit. The project was managed and completed by Mr. Hamid M. Tehrani, P.E., currently the Director of Engineering at Raheja Construction